Production control

Actual output vs. target, by line and by hour, during the shift.

Line 1 · output per hour vs targetActive order · 400 g patties · now: 11:20illustrative example
hourly target
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00

10:00 · the line is 29% below target — there's still time to correct within this shift.

The problem

You learn the shift's output when it's too late to fix it

Output is only known at the end of the shift, once someone adds up the sheets or counts pallets. If the breading line fell behind at 9:00, nobody knew in time to act.

Being validated on the plant floor

Sound familiar?

  • The supervisor asks “How are we doing?” and nobody has the number.
  • Reported output doesn't match what ships from the dock.
  • Late orders are discovered the next day.
  • Each shift keeps its own records, and they're never compared.

How we approach it

We start from the production order and one reliable counting point. Output rate and running total show in real time against the target.

  1. 1. We choose the counting point

    Fryer exit, packaging infeed or finished pallets, whichever matters for your order.

  2. 2. We load orders and targets

    Each line is linked to its active order, product and hourly rate standard.

  3. 3. We show output hour by hour

    The gap to target is visible while there's still time to close it.

  4. 4. We close the shift on the same data

    The shift report comes from the same count, with no sheets to retype.

What it takes

Software

  • Production dashboard by line and shift
  • Production orders with hourly targets
  • Shift-close report
The full platform →

Plant equipment

  • One counting source: a computer vision camera or a signal from an existing machine
  • A floor display or tablet for the supervisor
How we select equipment →

Final setup depends on the line and its existing counting signals; it's defined during technical design.

Who uses it and what they decide

Shift supervisor
Sees whether the line is on rate for the order and reacts within the shift.
Plant manager
Compares lines and shifts on the same basis.
Planning
Knows how much of each order is left.
Leadership
Gets the day's output without hand-tallied sheets.

Decisions it supports

  1. 01Reinforce a line or move people before the shift ends.
  2. 02Replan an order that won't hit its target.
  3. 03Decide which line to check first when several are behind.

How value is measured

We measure before and after, on your line. Value is shown with your data.

Actual vs. target output per hour
Recorded from day one and compared week over week.
Gap between reported and counted output
Manual reports and the automatic count, compared side by side.
Time to close the shift report
Before and after sheets no longer need retyping.
Estimate the value of this problem

Let's start with one problem.

Tell us what's costing you most today. We'll review it with you, show how we'd solve it and estimate its value together.