Production and performance

Downtime and OEE

Every stop with time, duration and cause, and an OEE you can explain.

Shift A · every stop with cause and durationillustrative example
07:0011:0015:00
Availability
86 %
69 min stopped
Performance
89 %
vs standard
Quality
96 %
good product

OEE = availability × performance × quality = 74%

The problem

Short stops go unrecorded, but they add up

A five-minute jam at the fryer exit seems minor. Repeated several times a shift, it's lost output nobody can explain, because it was never recorded.

Being validated on the plant floor

Sound familiar?

  • The downtime log only shows the long stops.
  • Causes are filled in from memory at shift end.
  • OEE, if tracked at all, is a number nobody can break down.
  • Maintenance and production argue over why the line stopped.

How we approach it

We detect stops from product flow or a machine signal. Start and duration are logged automatically; the supervisor just confirms the cause.

  1. 1. We define a stop

    How many seconds without product count as a stop, and which stops are planned (changeovers, cleaning).

  2. 2. We log it automatically

    Start time and duration, with nothing written by hand.

  3. 3. We confirm the cause on the floor

    The supervisor picks from a cause list agreed with your team, on a tablet or phone.

  4. 4. We break down OEE

    Availability, performance and quality by line, shift and product, each traceable to its source.

What it takes

Software

  • Automatic stop log with cause list
  • OEE by line, shift and product
  • Downtime analysis by cause
The full platform →

Plant equipment

  • The line's counting source (camera or machine signal)
  • Tablet or phone to confirm causes
How we select equipment →

If the line already has a run/stop signal, we use it; if not, stops are detected from product flow. Defined during technical design.

Who uses it and what they decide

Shift supervisor
Confirms causes while the stop is fresh.
Maintenance
Sees which equipment stops most, and for how long.
Plant manager
Knows which cause cost the most time this week.
Continuous improvement
Picks the next problem to tackle, based on data.

Decisions it supports

  1. 01Which stop cause to tackle first.
  2. 02Whether a problem is equipment, material or method.
  3. 03When to schedule preventive maintenance on critical equipment.
  4. 04How to plan changeovers to lose less time.

How value is measured

We measure before and after, on your line. Value is shown with your data.

Unplanned downtime minutes per shift
Baseline from the first weeks, compared after each action.
Stops without a recorded cause
Share of stops with a confirmed cause, week by week.
OEE and its three components
Calculated with the same rule before and after.
Estimate the value of this problem

Let's start with one problem.

Tell us what's costing you most today. We'll review it with you, show how we'd solve it and estimate its value together.