Production and performance
Downtime and OEE
Every stop with time, duration and cause, and an OEE you can explain.
- Availability
- 86 %
- 69 min stopped
- Performance
- 89 %
- vs standard
- Quality
- 96 %
- good product
OEE = availability × performance × quality = 74%
The problem
Short stops go unrecorded, but they add up
A five-minute jam at the fryer exit seems minor. Repeated several times a shift, it's lost output nobody can explain, because it was never recorded.
Being validated on the plant floor
Sound familiar?
- The downtime log only shows the long stops.
- Causes are filled in from memory at shift end.
- OEE, if tracked at all, is a number nobody can break down.
- Maintenance and production argue over why the line stopped.
How we approach it
We detect stops from product flow or a machine signal. Start and duration are logged automatically; the supervisor just confirms the cause.
1. We define a stop
How many seconds without product count as a stop, and which stops are planned (changeovers, cleaning).
2. We log it automatically
Start time and duration, with nothing written by hand.
3. We confirm the cause on the floor
The supervisor picks from a cause list agreed with your team, on a tablet or phone.
4. We break down OEE
Availability, performance and quality by line, shift and product, each traceable to its source.
What it takes
Software
- Automatic stop log with cause list
- OEE by line, shift and product
- Downtime analysis by cause
Plant equipment
- The line's counting source (camera or machine signal)
- Tablet or phone to confirm causes
If the line already has a run/stop signal, we use it; if not, stops are detected from product flow. Defined during technical design.
Who uses it and what they decide
- Shift supervisor
- Confirms causes while the stop is fresh.
- Maintenance
- Sees which equipment stops most, and for how long.
- Plant manager
- Knows which cause cost the most time this week.
- Continuous improvement
- Picks the next problem to tackle, based on data.
Decisions it supports
- 01Which stop cause to tackle first.
- 02Whether a problem is equipment, material or method.
- 03When to schedule preventive maintenance on critical equipment.
- 04How to plan changeovers to lose less time.
How value is measured
We measure before and after, on your line. Value is shown with your data.
- Unplanned downtime minutes per shift
- Baseline from the first weeks, compared after each action.
- Stops without a recorded cause
- Share of stops with a confirmed cause, week by week.
- OEE and its three components
- Calculated with the same rule before and after.
Connects with
Stops come from the count; long ones trigger alerts, and all of them feed the loss-by-cause report.
- Automated countingA camera over the belt counts pieces and logs when product stops flowing.
- Alerts and follow-upThe problem reaches the right person right away, and the follow-up is recorded.
- Reporting and operational intelligenceWhat happened in the plant, ranked by what cost the most, with no spreadsheets to build.
Let's start with one problem.
Tell us what's costing you most today. We'll review it with you, show how we'd solve it and estimate its value together.