What are plant losses costing you today?
Enter your own figures. You'll see the estimated annual loss, an improvement scenario based on your assumptions, and every formula used.
Estimated annual loss: $76,500. Potential annual savings: $18,875.
Your estimate
Estimated annual loss
$76,500
50 production hours lost to stops per year
- Unplanned downtime
- $60,000
- 78%
- Scrap and rework
- $12,500
- 16%
- Manual record-keeping
- $4,000
- 5%
Potential annual savings
$18,875
Based on your reduction assumptions. Illustrative.
Investment payback
Enter an investment to calculate payback.
How it's calculated
- Unplanned downtime = 4 stops/wk × 15 min × $20/min × 50 wk = $60,000
- Scrap and rework = $250/wk × 50 wk = $12,500
- Manual record-keeping = 10 h/wk × $8/h × 50 wk = $4,000
- Potential annual savings = $60,000 × 25% + $12,500 × 15% + $4,000 × 50% = $18,875
What this estimate is
- It uses only the figures and assumptions you entered.
- It's not a result from Autech or any customer.
- A saving is only confirmed by measuring: a baseline at the start and the same measurement afterward.
- The real investment depends on the technical design of your line.